Futurestate Logo

Contact Us Now: 01204 410062

Linked In twitter Facebook
CASE STUDIES

Our Case Studies give a detailed example of the types of work we have carried out for clients and the benefits they have gained from our intervention. This gives you the confidence that we can deliver a range of results and also work in a multitude of industries.

To discuss the benefits of working with Futurestate Solutions please contact us or fill in the form opposite to arrange a Free Lean Manufacturing Review.

Sector:Manufacturing - Office Furniture Turnover: £25m No. of Staff: 320
Major Issues:
Reducing profit margin, increase in material and overhead costs, high levels of local competition, quality issues, poor staff morale, lead times too long
Results:
Increased Productivity by up to 200% and transformed the culture to one driven by continuous improvement...read more
Comapany
Sector:Manufacturing - Upholstery Turnover: £7m No. of Staff: 25
Major Issues:
Supplier/overhead costs increasing, rapidly growing in size, struggling to meet demand, regular material stock outs, poor staff morale, lead times too long
Results:
Over a 2 month period. Increased Productivity by 20%, Reduced floor space requirements by 43% . . . read more
Comapany
Sector:Manufacturing - Metal Fabrication Turnover: £3m No. of Staff: 57
Major Issues:
Profit reducing, supplier and energy price increase, customers will not accept price increase, over stocked, quality standards dropped, poor morale, lead times too long
Results:
Increased Productivity by 200%, Reduced lead times by 86% . . . read more
Comapany
Sector:Manufacturing - Security Products Turnover: £1m No. of Staff: 12
Major Issues:
Poor profit margin, Poor management controls, High number of quality failures, Productivity very low, Poor staff morale, Untidy factory causing risk to health and safety
Results:
Increased Productivity by 89%, Reduced stock levels by 51% . . . read more
Comapany
Sector:Manufacturing - Wood Machining Turnover: £4m No. of Staff: 52
Major Issues:
Output compared to capacity is low, 3 shifts running 24 hours only just coping with demand, poor staff morale, regular machine breakdowns, increasing costs due to energy prices
Results:
Increased uptime and reduced number of shifts from 3 to 2 . . . read more
Comapany

Clients


Lancashire | Manchester | Bolton | Wigan | Oldham | Rochdale | Burnley | Blackburn | Preston | Blackpool | Lancaster